Gujarat Electricity Bill Calculator – UGVCL, DGVCL, PGVCL, MGVCL (2026)

For homes supplied by UGVCL, DGVCL, PGVCL or MGVCL. Includes the fuel surcharge (FPPAS) and electricity duty, which together add almost as much as the slab charges. Torrent Power customers in Ahmedabad and Surat: use this calculator.

⚡ Gujarat bill at a glance (a month)

100 units a month₹703
200 units a month₹1,492
300 units a month₹2,344

⚠️ Fuel surcharge and duty add ₹749 to a ₹743 slab charge at 200 units — see why ↓

Urban, 2 kW load, July–September 2026 FPPAS, 15% duty. Current rates, checked 18 Sep 2026. Use the calculator for your exact units and load.

Calculate your Gujarat bill

Current Gujarat tariff (2026)

Rate RGP (residential), FY 2026-27, per month.

UnitsUrbanRural
First 50₹3.05₹2.65
51 – 100₹3.50₹3.10
101 – 250₹4.15₹3.75
Above 250₹5.20₹4.90
Fixed charge₹15 (≤2 kW) · ₹25 (≤4 kW) · ₹45 (≤6 kW) · ₹70
FPPAS (Jul–Sep 2026)₹2.45/unit + 3.99%
Electricity duty15% urban · 7.5% rural, on the whole bill

Gujarat light bill for common usage (a month)

2 kW load, July–September 2026 FPPAS. Urban = 15% duty, rural = 7.5%.

UnitsEnergy & per-unit chargesFixed chargeTaxes & % surchargesYour billPer unitRural
50₹275.00₹15.00₹56.81₹347₹6.94₹302
100₹572.50₹15.00₹115.08₹703₹7.03₹612
150₹902.50₹15.00₹179.72₹1,097₹7.31₹959
200₹1,232.50₹15.00₹244.37₹1,492₹7.46₹1,305
250₹1,562.50₹15.00₹309.01₹1,887₹7.55₹1,652
300₹1,945.00₹15.00₹383.93₹2,344₹7.81₹2,063
400₹2,710.00₹15.00₹533.79₹3,259₹8.15₹2,884
500₹3,475.00₹15.00₹683.64₹4,174₹8.35₹3,706

Why a Gujarat bill is much higher than the slab rate

Gujarat's slabs look cheap — ₹3.05 to ₹5.20 a unit — and they are telescopic, so there's no sudden slab trap. The surprise is what comes on top. For 200 units in a town (2 kW):

  • Slab energy charge: ₹742.50
  • Fuel surcharge (FPPAS ₹2.45/unit + 3.99%): ₹539.78
  • Electricity duty (15% of everything): ₹194.59

So the bill is ₹1,492 — about ₹7.46 per unit, not ₹4.15. Only about 50% of the bill is the slab charge. FPPAS changes every quarter, so the same units can cost more or less next quarter.

Worked example — 200 units, urban, 2 kW

Units 1–50 × ₹3.05₹152.50
Units 51–100 × ₹3.50₹175.00
Units 101–200 × ₹4.15₹415.00
Fuel surcharge – FPPAS base @ ₹2.45/unit₹490.00
Fixed charge₹15.00
Fuel surcharge – FPPAS variable @ 3.99%₹49.78
Electricity duty @ 15%₹194.59
Total₹1,491.87

Uses the July–September 2026 FPPAS. The duty exemption for rural homes using 250 units or less a year is not modelled.

Frequently Asked Questions

For UGVCL, DGVCL, PGVCL and MGVCL homes in towns: ₹3.05 for the first 50 units, ₹3.50 for 51–100, ₹4.15 for 101–250 and ₹5.20 above 250 (rural rates are 40 paise lower in most slabs). On top of that come the fuel surcharge (FPPAS, ₹2.45/unit + 3.99% from July 2026), a small fixed charge and electricity duty.

About ₹1,492 a month in a town and ₹1,305 in a village, for a 2 kW connection with July–September 2026 FPPAS.

FPPAS is the fuel and power purchase adjustment surcharge. From July 2026 it is ₹2.45 per unit plus 3.99% of energy, base FPPAS and fixed charges. It is revised every quarter.

15% for urban homes and 7.5% for rural homes, on all charges payable to the DISCOM (energy, fixed and FPPAS). Rural homes using 250 units or less in a year are exempt.

No. Torrent Power (Ahmedabad, Gandhinagar and Surat) has its own slabs and a different fuel surcharge. Use the Torrent Power bill calculator on CalcNetra for those areas.

Sources · checked 18 Sep 2026